Rehabilitation of bridges in telephone exchanges

​​​

  • Removal of bridges that are pointed or both ends, or connected out of service in the slats (Horizontal, Vertical and Services)

​

  • Change of bridges when they are tense, spliced ​​or with incorrect trajectory. It is not considered to rehabilitate bridges with a rappelling less than 5 turns on the spike of the splint.

​

  • Rehabilitation of bridges that includes the adjustment and accommodation of bridges with excess length between slats in the DG.

​

  • Removal of slats without service in the DG, either on the Horizontal or Vertical side, and / or Cables associated with the slats without service, includes their disconnection at the entrance or exit to equipment.

​

  • Change of slats in service in the DG (assembly and connection), either Horizontal or Vertical side. A maximum of 3 tablets per DG is allowed. If you need to change more slats, you must request authorization from the Corporate Exploitation area.

​

  • Fixing of slats, which are "loose". Installation of the fuse tester, when it does not exist (when applicable, it must be provided by the head of the Central).

​

  • Rehabilitation of the External Plant cable landing with its respective Vertical in the DG, which are loose, broken or missing shoes, shoes without fastening to the fitting of the DG and pointed ground cables. In case of missing completely the landing of cables from the External Plant, inform the person in charge of the plant, so that he may request the corresponding one and the landing of the missing cables be made.

​

  • Laying of missing or damaged labels on cables that are finished on the boards; but this only applies tablets that were changed in the DG.